NO.G.13018/1/2020- PO(BKT)/152
OFFICE OF THE PROGRAMME OFFICER
MAHATMA GANDHI NREGS
BILKHAWTHLIR RD BLOCK
Dated Bilkhawthlir, the 16th September, 2020.
WORK ORDER
District Programme Coordinator, Kolasib District aá¹anga hriattirna kan dawn angin Programme Officer, MGNREGS Bilkhawthlir RD Block Job Card neitute tan ni sawm (10) inhlawhna, September thla atan tihchhuah a ni a, hnathawh tur rawn thil tel nghal a ni e.
Hnathawh tur hi VEC, BFT, VLAA leh TA-te’n a á¹ul a nih chuan peg an kheng ang a, hnathawh endik pawh an kutah a awm ang. Hna thawh tur hi measurement tarlan ang hian thawh zawh tur a ni. Hna thawh hma hian E-MR uluk taka lo enfel hmasak ni se a lawmawm hle ang. Hna thawh hma, thawh lai leh thawh zawh thlalak, hard leh soft copy-in thehluh vek tur a ni a, a hnuaia format siam ang hian cement concrete display board siam ngei tur a ni bawk. A hun taka hlawh siam a nih theih nan E-MR hi 2nd October, 2020 aia tlai lovah Programme Officer Office-ah thehluh tur a ni. Timely payment-ah harsatna kan neih loh nan E-MR a hun takah thehluh tur a ni.
MGNREGA danin a sawi angin hnathawh nan khawl hman awih a ni lova, hmang lui an awm a nih chuan hlawh inpek chungchangah harsatna a awm a nih pawhin sawi buai theih a ni lovang. Nitin attendance VEC leh VLAA ten uluk takin an la tur a ni. Hnathawh tur hi VEC ten information mike/FLS ah lo puan tur a ni e. Hna hi thawh hma, thawh lai leh thawh hnu tag tawh tur a ni e.
Inhlawhna hi State sorkar thu chhuah No.C.30019/8/16-RD(NREGS) Dated 18th May, 2018 leh mila thawk duhte tan chauh siam a ni.
Rural Development Department thu chhuah No.B.13016/1/17-RD(MGNREGS) Dated 13th September, 2019- in a lo sawi angin MGNREGS hnuaia hnathawk hlawhte hi eng thil vang mahin midang tumahin an lakpen (cut) sak tur a ni lo.
Mahatma Gandhi NREGS Bilkhawthlir RD Block 2020-21 Hna hming : Work Code : Hna á¹anni : 19.09.2020 Hna zawh ni : 29.09.2020 Tha sen zat (Mandays): Hna thawktu hming : Contact : 9612700023 (Ombudsman) (For Grievance and Redressal if available) |
Sd/-
(NENG THIANLALA)
Programme Officer
Mahatma Gandhi NREGS
Bilkhawthlir RD Block.
NO.G.13018/1/2020- PO(BKT)/152 Dated Bilkhawthlir, the 16th September, 2020.
Copy to :-
- The DPO, MGNREGS, DRDA Kolasib District lo hriat atan.
- Technical Assts./BFTs lo hriat atan leh work completion date aá¹anga kar 1 chhunga work measurement theh luh tur bawhzui turin.
- VLAAs lo hriat atan leh Work completion leh EMR theh luh tur lo bawh zui turin.
- Chairman, VEC______________________________ lo hriat atan leh bawhzui turin.
Sd/-
Programme Officer
Mahatma Gandhi NREGS
Bilkhawthlir RD Block
WORK ORDER 2020-2021 :10Days of Work : Dt 19th-29th | |||||||||||
Name of Village | Sl No | Name of Work | Total No. of Active Job Card | Total No. of Job Demand | No. of days | Man days | Estimated Cost | Physical in Metre | |||
Wages | Nos | Length | Breadth | Height | |||||||
Bilkhawthlir South | 1 | Halfmoon terrace mimal huan 6 ah | 587 | 587 | 10 | 5870 | 1320750 | 978x6 | 1 | 1 | 0.5 |
Bilkhawthlir North | 1 | Halfmoon terrace mimal huan 6ah | 548 | 548 | 10 | 5480 | 1233000 | 913x6 | 1 | 1 | 0.5 |
N Chhimluang | 1 | Terrace laih mimal huan 1 ah | 90 | 90 | 10 | 900 | 202500 | 1 | 300 | 1.5 | 1 |
Vairengte I | 1 | Halfmoon terrace mimal huan 9 ah | 813 | 813 | 10 | 8130 | 1829250 | 903x9 | 1 | 1 | 0.5 |
Vairengte II | 1 | Halfmoon terrace Mimal huan 10 ah | 934 | 934 | 10 | 9340 | 2101500 | 10x934 | 1 | 1 | 0.5 |
Saihapui V | 1 | Halfmoon terrace mimal huan 1 ah | 57 | 57 | 10 | 570 | 128250 | 570 | 1 | 1 | 0.5 |
Phainuam | 1 | Terrace laih mimal huan 2 ah | 257 | 257 | 10 | 2570 | 578250 | 2 | 428.4 | 1.5 | 1 |
Saipum | 1 | Halfmoon terrace laih mimal huan 5 ah | 496 | 496 | 10 | 4960 | 1116000 | 992x5 | 1 | 1 | 0.5 |
Saiphai | 1 | Halfmoon terrace laih mimal huan 5 ah | 459 | 459 | 10 | 4590 | 1032750 | 918x5 | 1 | 1 | 0.5 |
N Chawnpui | 1 | Halfmoon terrace mimal huan 1 ah | 89 | 89 | 10 | 890 | 200250 | 890 | 1 | 1 | 0.5 |
Vairengte III | 1 | Terrce laih mimal huan 3 ah | 305 | 305 | 10 | 3050 | 686250 | 3 | 338.9 | 1.5 | 1 |
Vairengte IV State veng | 1 | Halfmoon terrace mimal huan 2 ah | 181 | 181 | 10 | 1810 | 407250 | 905x2 | 1 | 1 | 0.5 |
10 Days Work Order September : 19th - 29th September 2020 | ||||||||||||
Name of Village | Sl No | Name of Work | Total No. of Job Card | No. of days | Man days | Estimated Cost in Lakhs | Physical in Metre | |||||
Wages | Total | No | L | B | H | |||||||
Bairabi North | 1 | Half moon terrace at Lalengvara huan and 9 others Bairabi North September 10 days | 774 | 654 | 10 | 6540 | 14.71500 | 14.71500 | 6540 | 1 | 1 | 0.5 |
2 | Chilui kawng levelling at S.Chhimluang | 120 | 10 | 1200 | 2.70000 | 2.70000 | 1 | 150 | 2 | 2 | ||
Bairabi South | 3 | Land Levelling at B Suarhliap zau Bairabi South September 10 days | 354 | 354 | 10 | 3540 | 7.96500 | 7.96500 | 1 | 590 | 3 | 1 |
Meidum | 4 | Sangha dil at Zahnuna huan Meidum September 10 days | 208 | 208 | 10 | 2080 | 4.68000 | 4.68000 | 1 | 57.778 | 15 | 1.2 |
Pangbalkawn | 5 | Sangha dil at Zohmingthanga jc no 63 huan Pangbalkawn September 10 days | 202 | 202 | 10 | 2020 | 4.54500 | 4.54500 | 1 | 29.023 | 29 | 1.2 |
Saihapui K | 6 | Sairil lui zau kawnglaih3 September 10 Days Saihapui K | 155 | 155 | 10 | 1550 | 3.48750 | 3.48750 | 1 | 86.111 | 3 | 3 |
Bukvannei | 7 | Hall panna September 10 Days Bukvannei | 134 | 134 | 10 | 1340 | 3.01500 | 3.01500 | 1 | 167.5 | 2 | 2 |
Buhchangphai | 8 | Sangha dil at C Lalremzela huan and others September 10 Days Buhchangphai | 211 | 211 | 10 | 2110 | 4.74750 | 4.74750 | 2 | 65.938 | 4 | 2 |
Phaisen | 9 | Halfmoon terrace at Ramhluna JC 53 and other September 10 Days Phaisen | 139 | 139 | 10 | 1390 | 3.12750 | 3.12750 | 1390 | 1 | 1 | 0.5 |
Gosen | 10 | Vengthar kawnglaih3 September 10 Days Gosen | 89 | 89 | 10 | 890 | 2.00250 | 2.00250 | 1 | 49.445 | 3 | 3 |
New Builum | 11 | Half moon terrace at maenga huan September 10 Days New Builum | 100 | 100 | 10 | 1000 | 2.25000 | 2.25000 | 1000 | 1 | 1 | 0.5 |
Khuangpuilam | 12 | Halfmoon terrace at mimal huan 3 nos September 10 Days Khuangpuilam | 343 | 343 | 10 | 3430 | 7.71750 | 7.71750 | 3430 | 1 | 1 | 0.5 |
10 Days Sept 2020 Work period (19 -29 Sept. 2020) | |||||||||||
Village name | Sl.No | work name | No of job card demand | No of JC | days | mandays | wage | Nos | L | B | H |
Rengtekawn | 1 | Const of Halfmoon terrace 10days sept 2020 Rengtekawn | 305 | 305 | 10 | 3050 | 686250 | 1016 | 3050 | 1 | 0.5 |
Hmarveng | 1 | Land leveling at PU C.Thanmawia(L) house to RSTC complex 10 days Sept. 2020 | 636 | 636 | 10 | 6360 | 1E+06 | 454.286 | 3.5 | 2 | |
Venglai | 1 | Land leveling 10 days Sept. 2020 | 962 | 481 | 10 | 4810 | 1E+06 | 80.1667 | 20 | 1.5 | |
2 | Const of Halfmoon terrace 10 days sept. 2020 venglai | 481 | 10 | 4810 | 1E+06 | 2405 | 4810 | 1 | 0.5 | ||
Diakkawn | 1 | Const. of Bench terrace 10 days sept. 2020 | 881 | 881 | 10 | 8810 | 2E+06 | 2936.67 | 1.5 | 1 | |
Vengthar | 1 | Land leveling 10 days Sept. 2020 | 587 | 200 | 10 | 2000 | 450000 | 208.333 | 1.2 | 4 | |
2 | Const of Halfmoon terrace 10 days sept. 2020 vengthar | 387 | 10 | 3870 | 870750 | 1 | 3870 | 1 | 0.5 | ||
New Diakkawn | 1 | Const of Halfmoon terrace 10 days sept.2020 | 448 | 448 | 10 | 4480 | 1E+06 | 2240 | 4480 | 1 | 0.5 |
Saidan | 1 | Const of Halfmoon terrace 10days Sept 2020 Saidan | 190 | 190 | 10 | 1900 | 427500 | 1900 | 1 | 0.5 | |
Tumpui | 1 | Const of Halfmoon terrace 10days Sept 2020 Tumpui | 458 | 229 | 10 | 2290 | 515250 | 1145 | 2290 | 1 | 0.5 |
2 | Const. of Bench terrace 10 days sept. 2020 Tumpui | 229 | 10 | 2290 | 515250 | 763.333 | 1.5 | 1 | |||
College veng | 1 | Const. of Half-moon terrace 10 days sept 2020 College veng | 298 | 298 | 10 | 2980 | 670500 | 1470 | 2980 | 1 | 0.5 |
Project veng | 1 | Const. of Bench terrace 10 days sept. 2020 | 309 | 309 | 10 | 3090 | 695250 | 3090 | 1 | 0.5 | |
Electric veng | 1 | Const. of Bench terrace 10 days Sept 2020 Electric veng | 236 | 236 | 10 | 2360 | 531000 | 786.667 | 1.5 | 1 | |
N.Thinglian | 1 | Bench terrace 10 days sept. 2020 N Thinglian | 94 | 94 | 10 | 940 | 211500 | 313.333 | 1.5 | 1 | |
Venglai East | 1 | Const. of Bench terrace 10 days sept. 2020 | 330 | 330 | 10 | 3300 | 742500 | 1100 | 1.5 | 1 | |
Tuithaveng | 1 | Const. of Bench terrace 10 days Sept 2020 Tuithaveng | 266 | 266 | 10 | 2660 | 598500 | 886.667 | 1.5 | 1 |